サイズ:: | 5" (ID125mm/OD175mm)及び6" (ID150mm/OD200mm) | 厚さ:: | 0.5 mm |
---|---|---|---|
色:: | ステンレス製の銀製色または黒色火薬のコーティング | 材質:: | ステンレス製304 (1.4301)/316L (1.4404) |
に適用して下さい:: | 木製の非常に熱いストーブのヒーター/暖炉の多燃料のストーブ。 | 関係の様式:: | バンドを締めるソケットが付いている栓システム |
くまの温度:: | 600以上°C | パッキング。: | カートンおよびパレット ローディング |
テスト標準:: | EN1856-1 T600 N1 D V2 L50050 G50 | 標準:: | EN1856-1/ISO9001 |
ハイライト: | insulated metal chimney,stainless steel twin wall flue |
Introduction:
The Ruilun Twin wall insulated spigot chimney systems designed to meet the requirements for multi-fuel that operate under negative conditions. The systems with a specific range of components and use wide locking band to lock each other properly. The systems are CE approved by Famous Italy Kiwa test lab under EN1856-1.
The twin wall spigot chimneys are factory made and prefabricated double wall insulated stainless steel chimney systems. flues are full welding with high performance.
This special design and construction provide high thermal resistance the test temperature reaches 1100 °C and the normal use can under 600 °C continuous. Our skin surface can still stay at a low temperature. This system is both suits for Internal and external installations appliances.
Now the black flues are more and more popular in the home and public area.
1. Production Description:
Product Name: | Black 6'' Twin wall stainless spigot insulated chimney systems and flue pipe |
Series: | Twin wall insulated / Double Wall insulated |
Material: | Stainless 304(1.4301) / 316L (1.4404) |
Color: | This system is shiny stainless silver color or Black powder coating |
Size: | 5'' (ID125mm/OD175mm) & 6'' ( ID150mm/OD200mm) |
Thickness: | 0.5mm (+/-0.04mm) suit for National steel standard |
Insulation: | High density ceramic fibers insulation |
Certificate: | CE, ISO9001 |
Packing size: | Depend on the size of the product |
Weight: | 0.5KG-4KG |
Application: | Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater |
2. Related products pictures :
3. Packing and Delivery:
Packing details: Products packed with plastic bags and then into carton then packed into pallets.
Loading port: Shanghai Or Ningbo port.
Lead Time: 25 working days after confirming the order.
4. Why Choose us?
5. FAQ:
We are the Manufacturer.
T/T: 30% TT deposit and 70% TT balance See B/L loading or Before shipping
20 days after received the deposit.