サイズ:: | 5" (ID125mm/OD175mm)及び6" (ID150mm/OD200mm) | 厚さ:: | 0.5 mm |
---|---|---|---|
色:: | ステンレス製の純粋な銀製色はまたは黒いペンキである場合もあります | くまの温度:: | 600以上°C |
材質:: | ステンレス製304 (1.4301)/316L (1.4404) | 関係の様式:: | バンドを締めるソケットが付いているねじれロック システム |
パッキング。: | カートンおよびパレット ローディング | に適用して下さい:: | 木製の非常に熱いストーブのヒーター/暖炉の多燃料のストーブ。 |
標準:: | EN1856-1/ISO9001 | テスト標準:: | EN1856-1 T600 N1 W V2 L50050 G50 |
ハイライト: | twin wall insulated flue,insulated fireplace pipe |
Introduction:
The Ruilun Twin wall insulated twist lock chimney systems designed to meet the requirements for multi-fuel that operate under negative conditions. The systems with a specific range of components and use twist lock teeth to lock each other properly. The systems are CE approved by Famous Italy Kiwa test lab under EN1856-1.
The twin wall twist lock chimneys is a factory made and prefabricated double wall insulated stainless steel chimney systems. flues are full welding with high performance.
This special design and construction provide high thermal resistance the test temperature reaches 1100 °C and the normal use can under 600 °C continuous. Our skin surface can still stay at a low temperature. This system is both suits for Internal and external installations appliances.
1. Production Description:
Product Name: | 6'' Double wall insulated stainless chimneys twist lock system |
Series: | Twin wall insulated / Double Wall insulated |
Material: | Stainless 304(1.4301) / 316L (1.4404) |
Color: | stainless pure silver color or can be black paint |
Size: | 5'' (ID125mm/OD175mm) & 6'' ( ID150mm/OD200mm) |
Thickness: | 0.5mm (+/-0.04mm) suit for National steel standard |
Insulation: | High density ceramic fibers insulation |
Certificate: | CE, ISO9001 |
Packing size: | Depend on the size of the product |
Weight: | 0.5KG-4KG |
Application: | Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater |
2. Related products pictures :
3. Packing and Delivery:
Packing details: Products packed with plastic bags and then into carton then packed into pallets.
Loading port: Shanghai Or Ningbo.
Lead Time: 28 working days after confirming the order.
4. Why Choose us?
5. FAQ:
We are the Manufacturer.
T/T: 30% TT deposit and 70% TT balance See B/L loading or Before shipping.
20 days after received the deposit.